GridWorkshop
3D asset

9mm SMG, Rigged and Textured (Roblox tested)

A detailed 9mm submachine gun split into 18 parts, with 72 PBR texture maps and a Roblox rig script. 56,931 triangles.

Description

56,931 triangles in total, across 18 separate parts. The largest part is 12,025. This is a detailed model, built for first person use and showcases. Check the triangle count before you buy.

A textured 9mm submachine gun, split into separate parts so the bolt, trigger, selector, mag release and magazine can move.

What is included

  • The model as an FBX (18 meshes, standard FBX that other tools can read)
  • 72 PBR texture maps, 4 per part: BaseColor, Normal, Roughness, Metalness
  • A Roblox rig script that rebuilds the joints and attachment points when the gun loads
  • 21 preview renders
  • README with the import setting, pivot table, part list and triangle counts
  • Licence file

Tested in Roblox

Imported into Roblox Studio and rigged with the included script. The bolt handle slides, the bolt rides with it, and the trigger turns. Roblox's importer drops the pivot markers, which is why the rig script is included.

Other engines (Unreal and Unity)

Roblox tested. It is a standard FBX with PBR maps, so with some setup it can be used in Unreal and Unity. Expect to set the scale (the FBX is in centimetres and the gun is about 67 cm long), check the forward axis, and arrange the maps to suit the engine (for example packing roughness and metalness, and flipping the normal map green channel for Unreal). Not tested in those engines. The rig script is Roblox only. In other engines the parts and pivots are there for you to rig yourself.

Good to know

  • High triangle count, about 57k for one gun. Fine as a first person model on PC. Think about a lighter version if you need many guns on screen or mobile support.
  • Roblox shows the four 2048 sight textures at 1024.
  • The metal on the receiver shows faint streaks under some lighting.
  • No bones. Moving parts are separate meshes with pivots.
  • Tested in Roblox Studio and Blender 5.0 only. Unreal and Unity need some setup and have not been tested.
  • No sound or game scripts are included.

Licence

Use it in your own games and projects, free or commercial. You may not resell, share or redistribute the files, or publish them as a model on the Roblox Creator Store. No credit needed.

This model depicts a firearm and is made for games and fiction.

Related

Get new products first

New templates and assets are announced on the GridWorkshop list, which is run through Gumroad. You join on the shop page.

Join the list on Gumroad